Setting Up Inspection Workflow Requirements

Previous Next

Requirements for inspections can be defined for each inspection template for both Form and Issue List inspection templates. The inspection workflow requirements that can be set up include:

Request required – allows a subcontractor to request an inspection
No issues completion - prevents inspection from being updated to Complete if any issues remain open
Approval required- multi-step approval of inspection results required to complete the inspection
Link Inspection – upon completion of an inspection with notification, schedules a predefined subsequent inspection
Responsible party assignment required – requires assignment of a subcontractor for issues reported.  This option is available for Commissioning Inspection Templates.
Start on/Finish by – populates the Start on and Finish by data fields on the Issue Details page using the current date as the start date and calculating the finish date based on the threshold defined.  This option is available for Commissioning Inspection Templates.

Copyright © 2008, 2018, Oracle and/or its affiliates. All rights reserved.